Spaulding Fibre Plant

Project: Spaulding Fibre Plant
Owner: Erie County Industrial Development Agency ECIDA Buffalo, NY
Location: Tonawanda, NY
Highlights:
  • 500,000 sf Demolition of multiple structure manufacturing facility
  • Asbestos abatement including pipe insulation, roofing/flash, vessel, caulk, ceiling tiles and VAT/mastic
  • Removal of universal waste lights, bulbs, ballasts, instrumentation controls and mercury switches
  • Removal and disposal of all hazardous waste
  • Dismantlement and removal of two boilers prior to demolition of structures
  • Demolition included 250’ boiler stack, two boiler houses and six 150’ventilation stacks.