General Motors Corp. Flint Truck Assembly Plant

Project: General Motors Corp. Flint Truck Assembly Plant
Owner: General Motors Corporation/E&L Construction Group
Location: Flint, MI
Highlights:
  • 50,000 linear foot Production Line.
  • Asbestos abatement of pipe, transite panels, caulk and vessel insulation
  • Select demolition and removal of all production line equipment, support structure, inter-stitching steel, conveyor systems, ventilation systems, electrical lines and support equipment.